IMC-YY’s product structure adjustment have achieved initial success

2013-7-1


In the first half of 2013, IMC-YY accelerated the steps of product structure adjustment, 72 vessels left after repair done, including 18 Ro-Ro vessels, 13 oil-tankers, 1 passenger vessel, 1 ship refrigerated transport vessel and other 39 vessels. The repair items of marine engineering were increased in large quantities. In July, IMC-YY will enter into a peak periods in production, 3 VLCCs are going to repair in IMC-YY at the same time.



友情链接:    大神彩票官网   大神彩票注册   牛蛙彩票网   菜鸟彩票--首页_欢迎您   球探足球比分