25,000T/H BWTS Installation

2012-3-24


In February 2012, IMC-YY shipyard has installed BWTS (ballast water treatment system) on a merchant vessel MV SHIN SANYO MARU, containing major piping installation for the ballast water treatment whose capacity is above 25,000 Ton/hour.


This installation is the 2nd case after the installation of such system on the PCTC MV HOEGH TROVE in Summer of 2010. The success of above cases brings IMC-YY good experience and makes the shipyard early bird among Chinese ship repair yards.


1522661444117304.png




友情链接:    福迎门彩票网址   菜鸟彩票--首页_欢迎您   同裕彩票平台   中福易彩登陆   中国体育彩票网 - 体彩中心